[phenixbb] General user proposal deadline May 15, 2010

Peter Zwart PHZwart at lbl.gov
Wed May 12 21:06:43 PDT 2010


Dear All,

Just a reminder that May 15, 2010 is the deadline for the July-August
2010 Rapid Access Proposal cycle for PX beamtime at the ALS. The BCSB
beamlines (5.0.1,5.0.2, 5.0.3, 8.2.1 & 8.2.2) can all be operated
remotely and are all equipped with ADSC Q315(R) detectors.  Beamlines
8.2.2, 8.2.1 and 5.0.2 are tuneable stations whereas 5.0.1 and 5.0.3
are fixed-wavelength beamlines. Control software for the beamlines
features an interface allowing ultra high-throughput screening,
automated annotation of diffraction quality and on the fly indexing
and collection strategy feedback.

The automounters in use on sector 5 support the unipuck and the ALS
puck (both commercially available at
http://www.crystalpositioningsystems.com). Beamlines 8.2.1 and 8.2.2.
support in addition to the uni- and ALS puck the Rigaku system
(http://www.rigaku.com/)

To submit a proposal, please go to the ALS website link listed below:
http://alsusweb.lbl.gov/4DCGI/WEB_GetForm/PXProposalEntry.shtml/Initialize

Thank you,
Stacey Ortega
510-495-2450



More information about the phenixbb mailing list